The Media Focus On
LAJA Hydropower Station (Chile) Engineering Contract Signed In KUNMING
Release date:2009-10-09 source:原创 browse:1266
Browse and share:

Mr. Guan, Vice President of UREC, signed the project contract with the representatives of the Chilean Owner

Mr. Guan, Vice President of UREC, had a group photo with the representatives of the Chilean Owner

Through the untiring endeavor and under the support of the leadership of our corp. together with the coordination of the relevant departments, LAJA Hydropower Station (CHILE) engineering contract was finally signed by UREC in Kunming on the date of September 21, 2009.

LAJA Hydropower Station is located in the territory of Chile, the total installation capacity of which is 17.2MWx2. As the contractor of the auxiliary engines, electric equipment and metal structures, UREC will be responsible for supplying the equipment, transportation, installation and other relative technical services. The project indicates the achievement of our enterprising and active exploration and exploitation as an integrated resources solution provider in front of the fierce competition. The signing of the contract has also laid the compact foundation for our further deploitation of South American market. 


copyright© 2022 All Rights  UREC  滇ICP备12005153号-1
    technical support:奥远科技